Hey, I'm 👋
Griffin Long
Agentic AI Engineer · Technical Founder
I don't out-type teams — I build and direct the AI agent tooling that lets one person ship at team scale.
My story
How a line cook ended up building AI agent systems.
I didn’t take the traditional route into software. I taught myself to build with AI while working as a line cook and taking college classes — experimenting with ChatGPT on the side until it turned into something real.
In March 2025 I turned that into GRAIsol. In the ~15 months since, it's grown into roughly 13,000 GitHub contributions across 100+ repos: an open-source agent runtime (agent-afk), a 369K-LOC AI GTM-automation platform, and 12 published open-source packages.
The throughline: I don't out-type teams — I build and direct the AI agent tooling that lets one person ship at team scale. Same energy I brought to the kitchen — high tempo, reliable under pressure — now pointed at shipping software end to end.




Things I've built
Open-source tools, production platforms, and the agent infrastructure behind them.
agent-afk
agentafk.com ↗ (opens in new tab)open-source TypeScript agentic coding-agent runtime/harness
LOC
~308K TS/TSX
npm versions
408
commits
1,542
license
Apache-2.0
36-instance non-networked subset, own-harness eval, web tools disabled
AgentGRAI
Modular Next.js / React AI lead-intelligence and outbound platform with multi-stage enrichment, async queue architecture, Gmail outbound engine, and AI SDR layer
LOC
~369K
commits
~1,900
timeframe
~5 months
substack-cli
↗ (opens in new tab)Full Python CLI wrapping Substack's unofficial API with write-safety gates and destructive-op guards
Goblin Portal
↗ (opens in new tab)Native macOS terminal in Swift 6 / AppKit — no Electron, no Xcode project — with a file-tree sidebar, 22-language syntax-highlighted editor, git status badges, split panes, shell integration, and 10 color themes gated by 345 contrast assertions
ElevenLabs Voice MCP
tools: 23
ClickUp MCP
tools: 19
Cursor Agent MCP
merged PRs: 40
E2B MCP
Twilio MCP
Smartlead MCP
GPT Image MCP
x-api-cli
↗ (opens in new tab)Full TypeScript CLI for the X/Twitter API v2 with OAuth 1.0a, OAuth 2.0, and Bearer auth
ga-cli
↗ (opens in new tab)Python CLI for the Google Analytics 4 API covering properties, reports, acquisition, referrers, and trends
agent-framework
Claude Code / agent-afk plugin for autonomous task execution through composable skills, subagents, and hooks
gadscli
Async Rust CLI for the Google Ads API, published to npm (npm-only)
A/B Experimentation Platform
5-service Docker Compose system with chi-squared significance from scratch, SHA-256 user bucketing, and database-level race-condition handling
On-Device AI Tools
Local macOS menu-bar dictation (mlx-whisper) and system-wide inline ghost-text completion (MLX Swift) for Apple Silicon
Tools I build with
The stack behind the projects above.
Languages
Frameworks & Runtimes
AI & Agents
Data & Infrastructure
Experience
From founding GRAIsol to embedded contract work and independent consulting.
Special Projects Engineer (Contract)
Capital Mischief / R360 / Charlie Garcia · Remote (Daytona Beach)
- Built a daily editorial intelligence pipeline (~7,960 LOC Python, 3 packages) for a 22K-subscriber finance Substack (~$1.76M ARR): prep, editorial judgment, brief generation, essay drafting, publish verdicts, and post-hoc scorecards.
- Designed deterministic anti-fabrication guards that drop any AI-drafted content whose facts, numbers, or named entities are not verbatim in the author's published words; human-in-the-loop approval required before anything ships.
- Built and run 7 automated cron/daemon tasks delivering daily research briefs, analytics pulses, desk dashboards, and Monday team briefings to 3 Telegram channels.
- Built a 4-panel HTML desk dashboard (fleet health, workflows, review queue, signal desk) with daily email delivery; packaged all systems as an agent-afk plugin with 100 test functions.
Founder and AI Systems Engineer
GRAIsol (opens in new tab) · Daytona Beach, FL
- Built and open-sourced agent-afk (agentafk.com), a TypeScript agentic coding-agent runtime/harness: ~308K LOC, 1,542 commits, 408 published npm versions, Apache-2.0.
- Architected AgentGRAI, a modular Next.js / React AI lead-intelligence and outbound platform (~369K LOC, ~1,900 commits in ~5 months): multi-stage enrichment on async QStash queues with Redis-semaphore concurrency control.
- Extended it with a Gmail outbound engine (multi-inbox rotation, AI sequences, open/click tracking, AI reply classification) and an AI SDR layer with ICP scoring and human-handoff routing.
- Published 12 open-source packages across npm and GitHub: 7 MCP servers (ElevenLabs Voice – 23 tools, ClickUp – 19 tools, Cursor Agent – 40 merged PRs / SSE on Vercel, E2B, Twilio, Smartlead, GPT Image), plus agent-afk, gadscli, substack-cli, x-api-cli, and ga-cli.
- Ran a one-person AI-leveraged studio delivering 30+ client and product builds.
- Accumulated ~13,000 GitHub contributions across 100+ repos since Mar 2025.
AI Systems Engineer (Contract)
Atlas Digital · Remote
- Embedded directly with client leadership to design and deploy an end-to-end CRM and agent automation pipeline: lead intake, enrichment, scoring, qualification, and outbound handoff in production.
- Built customer-facing agent workflows on Claude Agent SDK and OpenAI with structured fallback/retry logic and production observability; owned architecture end-to-end from design through deployment.
Independent AI Consultant
Remote
- Fuly Kids (fulykids.com): Diagnosed recurring LLM over-spend in FulyScan (AI food-scanning nutrition tool); shipped fix via merged PR adding Supabase/Postgres caching so repeat scans reuse stored results instead of re-invoking Claude.
- adside.ai: Delivered prioritized UX and product audit covering onboarding friction, cognitive overload, missing agency-facing tooling, data-freshness gaps, agent latency, and strategic positioning.
Right now
Last updated Sep 2026.
The Goblin Files
Beachy code goblin building shit in Daytona. Subscribe on Substack.
Let’s talk
Open to agentic AI engineering, technical leadership, and contract or consulting work — email is the fastest way to reach me.
Elsewhere

